Skip to main content

Questions tagged [gantt]

A {gantt} chart visualizes time horizons of complex activities, like projects. Use this tag, if this is the subject of your question.

Filter by
Sorted by
Tagged with
1 vote
1 answer
58 views

Trying to replicate this Gantt chart

I want to replicate some Gantt charts shown in the book “Operating System Concepts” to demonstrate how CPU scheduling algorithms work, like this one: I tried to replicate it using the pgfgantt ...
ncant's user avatar
  • 35
0 votes
0 answers
35 views

Expand or position Gantt chart to take two columns of space

How do I expand or position the Gantt chart so that it would take up two columns of my two-column layout, without adjusting the amount of text that comes before it or reordering sections, of course? ...
Andriy Sultanov's user avatar
0 votes
0 answers
49 views

Pgfgantt remove labels of month

My project has a 6 years duration and I want to realise a Gantt chart still readable in the width of the A4 page, in portrait format. I want to remove the labels (the numbers) in the month line of ...
the world is not flat's user avatar
1 vote
3 answers
140 views

Gantt chart - columns and rows are not aligned

My problem is that I can't seem to align the columns and rows in the Gantt chart. Namely, the first column should have a background color as in the example (Violet) and the second column (Duration) ...
Zeljko Hrcek's user avatar
2 votes
2 answers
401 views

How to draw custom arrows in Gantt chart?

I have the following Gantt chart, but I want to make the following modifications to it. There is currently a link from WP1 to WP2 (first and second bar). I want to keep that but instead of having a ...
pixel's user avatar
  • 1,370
5 votes
4 answers
575 views

SIMPLE gantt chart

The Gantt chart latex features are really complicated. I just want a simple little thing like this, for visualizing scheduling algorithm How should I do that? ETA: I took the the code from here and ...
motaylormo's user avatar
0 votes
0 answers
135 views

Gannt chart with Q1/Q2/Q3/Q4

I'm struggling with Gannt charts to replace months with Quarters (for having a more compact view). The question was previously asked here but I couldn't identify a proper answer. Any ideas? A second ...
Achille 's user avatar
0 votes
1 answer
61 views

pgfgantt- Adding a number line on top of gantt chart

How do you add a number line on top of a gantt chart as in the picture below? MWE added. \documentclass[ ]{article} \usepackage{pgfgantt} \definecolor{foobarblue}{RGB}{0,153,255} \newganttchartelement{...
GermanShepherd's user avatar
0 votes
1 answer
67 views

pgfgantt hide overlapping date

I am trying to hide any Date in the second row (in this case the Nov 14th) that will overlap at the border of the chart. Does anybody know how to do that, thanks in advance! \documentclass[a4paper]{...
Apikid's user avatar
  • 5
0 votes
2 answers
219 views

Combine multiple ganttbars for the same title

In the MWE below \documentclass{standalone} \usepackage{pgfgantt} \begin{document} \begin{ganttchart}[ vgrid, hgrid, bar/.append style={fill=red!50}, group/.append style={draw=black, fill=...
Tohiko's user avatar
  • 1,833
1 vote
3 answers
716 views

Gantt chart - borders and heading for task list and spacing in lines

\documentclass[tikz]{standalone} % Uncomment the following line to allow the usage of graphics (.png, .jpg) %\usepackage[pdftex]{graphicx} % Comment the following line to NOT allow the usage of ...
Sara ismail-sutton's user avatar
0 votes
1 answer
503 views

pgfgantt: How to add dates to the ends of the bar?

The problem I am making a Gantt chart using the pgffgantt package. I would like the dates of the tasks to be displayed above the bars (in orange in the image below) I tried to do things without ...
Brinfer's user avatar
  • 105
2 votes
2 answers
149 views

Language pgfgantt -> Translate to portuguese

How to translate the text in Portuguese? -Complete to completo -Today to hoje \documentclass[tikz]{standalone} \usepackage{pgfgantt} \title{Gantt Charts with the pgfgantt Package} \begin{document} ...
Andre Petroro's user avatar
1 vote
1 answer
642 views

How to increase the space between groups and tasks of Gantt Chart (pgfgantt package)

I was typing this gantt chart (code below), but I didn't figure out how to increase the space between "WP 1" and "Task 1.1" (please see figure attached). How can I do that? Thanks! ...
Vinícius's user avatar
3 votes
1 answer
537 views

PGF Gantt, group label inside

When using the ' inline ' option for a ganttgroup, the label is written above the group. I would like to thicken (this can be done with the parameter group height) the group and that the naming of the ...
xounamoun's user avatar
  • 221
2 votes
0 answers
110 views

Better time representation with Gantt chart (pgfgantt)

Pretty new to pgfgantt. Can anyone tell me how I can represent time with an $x$-axis , up the top of down the bottom of the chart? MWE: \documentclass[16pt]{article} \usepackage{pgfgantt} \usepackage[...
Chris Swan's user avatar
1 vote
1 answer
412 views

Gantttitle on more than one line

I would like to draw a Gantt chart. However, I need 15 weeks to be represented and it wouldn't fit in a single page so I would like to divide it by 3 with each section representing 5 weeks. \...
Dunno's user avatar
  • 329
0 votes
0 answers
170 views

How to draw/label timelines with gantt

I try to create timelines and want to label the timelines/nodes with text, either inside or above/Beneath the timeline. I´ve made extensive investigations but it seems as if I am unable to understand ...
Coliban's user avatar
  • 350
1 vote
0 answers
539 views

Make gantt chart a figure

I would like my Gantt chart to appear in my list of figures. Is there an easy way of 'casting' the Gantt chart to a figure format that would then automatically include it in the list of figures? ...
Philip's user avatar
  • 13
2 votes
1 answer
1k views

Only place milestone label in the gantt chart

I would like to keep all the labels of my gantt chart on the outside of the chart, but would like to add an extra note (the date) to a milestone which should be placed in the chart next to the ...
Philip's user avatar
  • 21
4 votes
1 answer
7k views

Draw Gantt chart LaTeX with pgfgantt

I tried the example given here. \documentclass{article} \usepackage{pgfgantt} \begin{document} \begin{figure}[ftbp] \begin{center} \begin{ganttchart}[y unit title=0.4cm, y unit chart=0.5cm, vgrid,...
Dunno's user avatar
  • 329
2 votes
2 answers
296 views

Gantt chart - set width of descriptions to be the same across charts

Hello and thank you for taking the time to look at my question. I have a \pgfgantt chart that I need to split into a couple as it's too long (I'm using the latest version of \pgfgantt installed ...
hacktacular42's user avatar
1 vote
0 answers
76 views

url hyperlink in gantt chart

I would like to embed an online url such as www.google.com in a gantt chart with \href{}{}. Unfortunately, this does not work for me. The links never become clickable. Reproducible example can be ...
S Front's user avatar
  • 111
1 vote
1 answer
782 views

Gantt chart bar label spacing issues

It took me a while to first of all get the spacing right on the gantt chart- easier if I could have found a way to shift the entire chart left but I could not find a way, I tried, flushleft but this ...
Sara Ismail-Sutton's user avatar
0 votes
0 answers
322 views

Gantt chart spacing, time unit change [duplicate]

The chart being produced is too wide, I only neede the unit of time every three-six months rather than every month? what is the valid format of the time unit to change this? e.g. i have tried 'x3 ...
Sara Ismail-Sutton's user avatar
0 votes
1 answer
1k views

How to create a schedule in beamer

I need to create this schedule in beamer, but I have no idea, because I am learning to use it
erika21148's user avatar
1 vote
1 answer
565 views

pgfgantt: milestone with two labels

Is it possible to modify the \ganttmilestone, such that it has (besides the label at north) a second, optional label positioned at south?
jj_p's user avatar
  • 637
0 votes
0 answers
161 views

2 ganttbar for one wp

I'm looking for something to make a double ganttbar for every WP, so I can put the estimated time, and the real time spent on each task. Something like in the picture As you may understand, the ...
Fr3d's user avatar
  • 141
0 votes
0 answers
287 views

Typesetting a Gantt chart

so I'd like to typeset a Gantt chart like the one pictured below. It shoud go: Year>Month>Day of month, preferably with the orientation in the second image: What I get: My code: \documentclass{...
Roberto_1986's user avatar
1 vote
1 answer
247 views

pgfgantt: How to set random days of the week to real days of the calendar?

Consider the following Minimum Working Example (MWE): \documentclass{standalone} \usepackage{pgfgantt} \begin{document} \begin{ganttchart} [ time slot format = isodate, ...
Dave's user avatar
  • 3,768
3 votes
1 answer
229 views

Help with Latex Gantt chart

I need a Gantt chart for my PhD proposal, and have found a simple example online. However, for 2019 I only need Q3 and Q4, but cannot see how to change this in the Latex code. Any help would be ...
cosmic noise's user avatar
0 votes
1 answer
689 views

How do I place labels to the left of the Gantt chart?

\begin{figure}[tbp] \begin {center} \begin{ganttchart}[y unit title=0.4cm, y unit chart=.5cm, vgrid,hgrid, title label anchor/.style={below=-1.6ex}, title left shift=.05, title right shift=-.05, ...
Anmol Kanotra's user avatar
1 vote
1 answer
204 views

Fitting Gantt Chart into Beamer

Could you please help me fit my gantt chart into the beamer? This is my code: \begin{ganttchart}[ y unit title=0.4cm, y unit chart=0.5cm, vgrid, time slot format=isodate-yearmonth, ...
Marianna Sebő's user avatar
1 vote
2 answers
4k views

Increase size and font size of a Gantt-chart in LaTeX-Beamer

I have created a Gantt-chart in a beamer presentation (with the help of this forum btw). But I want to make it a little bigger - it seems it could be a little bigger and still fit on the slight, ...
Luk's user avatar
  • 509
1 vote
0 answers
120 views

pgfgantt high temporal resolution

I would like to create a GANTT chart that covers 3 years and (this is the issue) where I can create work packages in daily resolution. Currently, I'm at this point: \documentclass[% a4paper,% ...
AndreH's user avatar
  • 53
3 votes
1 answer
317 views

How to control bar span on pgfgantt's ganttbar?

I would like to do Gantt chart in Latex thus I'm studying http://mirrors.ctan.org/graphics/pgf/contrib/pgfgantt/pgfgantt.pdf, so far I can do: by coding: \documentclass{article} \usepackage{pgfgantt} ...
KcFnMi's user avatar
  • 1,242
2 votes
1 answer
165 views

Alternative period format on pgfgantt's ganttbar, possible?

I would like to do Gantt chart in Latex thus I'm studying http://mirrors.ctan.org/graphics/pgf/contrib/pgfgantt/pgfgantt.pdf, so far I can do: by coding: \documentclass{article} \usepackage{pgfgantt} ...
KcFnMi's user avatar
  • 1,242
3 votes
0 answers
197 views

How to auto space things(months) in pgfgantt?

I would like to do Gantt chart in Latex thus I'm studying http://mirrors.ctan.org/graphics/pgf/contrib/pgfgantt/pgfgantt.pdf, where I can do something like: by coding: \documentclass{article} \...
KcFnMi's user avatar
  • 1,242
1 vote
2 answers
207 views

Alternative API for pgfgantt's ganttbar command

I would like to do Gantt chart in Latex thus I'm studying http://ftp.math.purdue.edu/mirrors/ctan.org/graphics/pgf/contrib/pgfgantt/pgfgantt.pdf, where I can do something like: by doing: \...
KcFnMi's user avatar
  • 1,242
0 votes
0 answers
371 views

pgfgantt spans width

I would like to draw Gantt chart, where: is generated by: \documentclass{article} \usepackage{pgfgantt} \begin{document} \begin{ganttchart}{1}{12} \gantttitle{2011}{12} \\ \...
KcFnMi's user avatar
  • 1,242
2 votes
1 answer
738 views

Task names on the right side of pgfgantt chart, possible?

I would like to do Gantt chart in Latex thus I'm studying http://ftp.math.purdue.edu/mirrors/ctan.org/graphics/pgf/contrib/pgfgantt/pgfgantt.pdf, where I see Is it possible to have the task names on ...
KcFnMi's user avatar
  • 1,242
1 vote
0 answers
247 views

gantt package progress bar

I would like to know if it is possible to provide the progression for each taskbar by partially filling with a completion percentage. The picture below clarifies the idea that I had in mind. All ...
Nadia Merquez's user avatar
2 votes
1 answer
661 views

gantt chart issues

I have two problems: The title of the gantt chart contains dotted lines that I don't want. Is it possible to also provide the progression of the taskbars? If so, how would that be done? ( please see ...
Nadia Merquez's user avatar
3 votes
1 answer
1k views

pgfgantt start on fractional unit (half month)

I'm building a Gantt chart with pgfgantt. I'm almost satified with the result but it seems that fractional values are not supported. For example the Today milestone is set on 2018-12-15 but it is ...
thibautg's user avatar
  • 133
2 votes
1 answer
1k views

How to reduce vertical spacing of grid in Gantt chart?

need help to reduce the vertical spacing of the grid in a Gant chart. Tried several attempts with y grid and so on, but noting works. Hope someone can help! \begin{center} \begin{tikzpicture}[y=0.1cm]...
ssaether's user avatar
2 votes
2 answers
2k views

Increase space between node label and start of Gantt chart

I just want to increase the space between the node labels and the start of my gantt chart. It just needs to be enough so that the first one doesn't over lap with the milestone. Any ideas how to do it? ...
Steven Thomas's user avatar
6 votes
1 answer
2k views

Gantt chart: How to remove progress bar from gantt group

I am trying to remove the progress bar from the top row of my gantt chart (the gantt group). I would like to use that row as a heading for individual projects. For example, I would like the "Project 1"...
Tom's user avatar
  • 63
2 votes
1 answer
439 views

Align progress values in ganttchart

For the given gantt chart \begin{ganttchart}[hgrid, vgrid, x unit=0.7cm, progress=today, today=4, newline shortcut=true, bar progress label node/.append style={right=5pt}]{1}{16} \gantttitlelist[...
Michael Dorner's user avatar
1 vote
1 answer
932 views

Alignment of inline bar labels

Does anyone know how to left-align inline labels (Task 3 & Task 4)? The code below, from an older manual version, does not work: Code: \begin{ganttchart}[vgrid, hgrid, inline,]{1}{12} \...
dbarge's user avatar
  • 11
0 votes
1 answer
760 views

Gantt chart with milliseconds as input

I want to create a diagram very similar to a Gantt chart. But it is in face run times from a workflow execution and they can be from milliseconds up to weeks... I am looking at pgfgant but I am not ...
jonalv's user avatar
  • 11.5k